Petestack Blog

19 February 2019

Long weekend progress

Filed under: Running,Sailing — admin @ 9:07 pm

It’s half-term weekend, so I’ve had Monday and Tuesday off school and four days to work on Fly, with Twig joining me for three of these. Already struggling to remember exactly what we got done on Saturday, but think we played a little with my table saw set-up before mounting the heater exhaust outlet fitting and spending most time on the fiddly task of templating and cutting the Treadmaster for the heads and forecabin. Then I took the chance to join Glencoe Hill Runners’ ‘Two Lairigs’ run on Sunday before returning to finish preparing the Treadmaster bonding surfaces before we stuck the stuff down yesterday (note the advanced holding-down technology!): (more…)

10 February 2019

Two weekends, one photo

Filed under: Sailing — admin @ 6:49 pm

Not much to see here, but winter Fly work continues…

A fortnight ago, worn down by weeks of long phone calls trying to resolve luckless issues with new mobile and broadband contracts, I took the whole weekend off and nothing got done. But Twig was here last Friday (delivering plywood in the snow!), Saturday and Sunday as well as Wednesday, and I’ve been working on my own this Friday, Saturday and Sunday to keep making modest progress. Twig’s got more wiring and stuff fitted as well as the heater pump and water tank vent, and we also got the fuel tank and port steering compass back in while we were both here. (more…)

27 January 2019

Things right and not right

Filed under: Sailing — admin @ 12:12 pm

Last weekend Twig and I got some tricky Fly jobs done in lining the parts of heads, forecabin and coachroof where the liner’s stuck directly on (there are removable panels elsewhere) then refitting the companionway bulkhead facing, and were quite relieved to get through this lot with things looking good and no major mishaps. But some things turned out to be not quite so right when I returned in Tuesday’s snow to take the photos… (more…)

13 January 2019

More bits and pieces

Filed under: Sailing — admin @ 5:42 pm

While Fly work’s obviously no longer progressing at late December/early January pace now I’m back at ‘work work’ for the new school term, it’s no way grinding to a halt either with various bits and pieces on and off the boat still getting evening and weekend attention… (more…)

1 January 2019

Flying into 2019

Filed under: Sailing — admin @ 6:30 pm

So it’s 1 January, Fly relaunching year, and the refit continues apace… (more…)

26 December 2018

Two months’ work in twenty photos

Filed under: Sailing — admin @ 4:54 pm

Last time I blogged (a month ago), you got the No-photo report (with photos), so today I follow up with ‘Two months’ work in twenty photos’ (which may just be twenty-one!), starting with what I’d already described and partially shown there: (more…)

25 November 2018

No-photo report (with photos)

Filed under: Sailing — admin @ 10:32 pm

I keep hoping to get some photos to show Fly progress, but prefer the non-flash photos and don’t get much light to work with in November, especially by the time I finish work (day job) during the week or boat work at weekends. So here’s what you might get to see soon if I get the chance… (more…)

21 October 2018

Two-month summary

Filed under: Sailing — admin @ 8:40 pm

While it’s been a while since I last reported on Fly progress here, things have still been happening and I’ve been saving up photos for a report. I’d planned to keep all the mast step rebuild pics for a complete account of that, but have decided just to publish anyway because I wanted to get something out. So what you see here might also include progress with the galley, water tank and seacock renovation, but it’s mostly about the not-quite-finished mast step (which should never sink into the deck again). (more…)

12 August 2018

Jigsaw pieces

Filed under: Sailing — admin @ 10:24 am

Having got about as far I can with on-boat work till I can check everything with Twig, I’ve been turning my attention to some of the removable pieces stored in my workshop. So now reporting progress with the chart table and forecabin bunk boards, and it does feel like the pieces of the jigsaw are starting to come together even if there are plenty more (battery box, heads door, pilot berth sections, saloon floor, headlining panels etc.) still to ‘fit’. (more…)

8 August 2018

Cavernous hellholes of peeling paint

Filed under: Sailing — admin @ 10:43 pm

No more!

You have to read that with the title because, one week and approximately 41 hours of work after I described Fly’s cockpit lockers as ‘cavernous hellholes of peeling paint on dirt on paint on dirt still awaiting a good clean back’, they’re just about ready (bar some minor filling etc.) to recoat with something more practically durable. (more…)

« Newer PostsOlder Posts »

Blog powered by WordPress. Feedback to webmaster@petestack.com.